MEP Coordination for Project Engineers
A practical guide to assigning, documenting, and verifying coordination decisions on commercial projects.
Download a sample issue registerWhat you’ll learn
- Identify installability, access, and service-clearance concerns in a model review.
- Assign an owner and due date to each decision, with a clear reference to the affected area.
- Know when to raise an RFI and record the response against the original issue.
- Verify the current drawing revision and field conditions before releasing work.
A worked corridor example
Follow a congested commercial corridor from an overhead clash through a documented decision, revised drawings, and a field check before installation.